A) Construction of superstructure metal body building 5.5, ” General cargo transhipment Building” and
B) Construction of steel roof of pedestrian bridge at Aspropyrgos city (Y.P / D).
C) Erection of the building. The erection of the main sector was realized with two cranes of lifting capacity of 650 tons and 350 tons.
Construction plans (3D Modelling & Shop Drawings), Industilization and Erection at site of constructions from structural steel of any
category.
The building elements are manufactured with beams formed from standard sections or welded plates, of whichever steel class and
dimension and according to current regulations. Hollow sections formed from standard profiles or welded plates, of whichever steel
class and dimension and according to current regulations.
Budget : 1.559.875,00 €